Enter an area to calculate the estimate.
- Gross area
- —
- Worked area
- —
- Construction
- —
- Professional fees
- —
- Furniture
- —
- All-in
- —
Estimator checks
Area schedule
Scheduled rooms can derive the gross area, or enter the confirmed demise area directly.
| Space | Source | sq ft | sq m | Remove |
|---|---|---|---|---|
| Scheduled rooms | 0.0 | 0.0 | ||
Pricing drivers
These inputs drive the four-tier model. Worked area is the area actually being physically reconfigured, not the lease area.
Scope and rate overrides
Exclude elements that are genuinely outside the brief. Only override a rate where you have project-specific evidence.
Worked-area construction
| Include | Element | Model rate | Override £/sq ft |
|---|
Gross-area services
| Include | Element | Applied rate | Override £/sq ft |
|---|
Four-tier cost build-up
The browser does not calculate these figures. They are returned by /api/calculate from kog_pricing.py.
| Element | Driver | Bucket | Qty | Rate | Total |
|---|
Construction cost
Legacy v1 estimate. Rates are per square foot of gross area.
| Element | £/sq ft | Budget | Share | Basis | Remove |
|---|---|---|---|---|---|
| Construction total | £0.00 | £0 | — | ||
Furniture schedule
Enter quantities only. Unit sell rates and installation are held in the v2 pricing engine.
| Furniture item | Qty |
|---|
Furniture, fixtures and equipment
Legacy v1 furniture schedule.
What if the area or the specification moves
Legacy v1 sensitivity matrix.
Exclusions, assumptions and risks
One item per line. These carry through to the saved estimate and export.
Order of cost estimate for internal use. Not a tender sum or a fixed price. Confirm the gross area, worked area, programme and services scope before issue.